Westplay
Landscape Architect Cheat Sheet: How to Write a Shelter Spec

Landscape Architect Cheat Sheet: How to Write a Shelter Spec

Westplay Team·

A clear shelter specification reduces ambiguity, keeps bids comparable, and prevents change orders caused by missing assumptions. This cheat sheet is designed for landscape architects writing a park shelter spec for tender packages and for municipalities that want a clean, defensible procurement document.

Table of Contents

Toggle

What a good shelter spec should accomplish

A strong pavilion specification should:

  • Define the shelter type and performance intent
  • Make pricing comparable across bidders
  • Reduce coordination gaps (foundations, access, installation)
  • Clarify what is included vs excluded

Shelter spec checklist (specifier-friendly)

1) Shelter type + roof style

  • Shelter type (hip, gable, cantilever, multi-sided)
  • Intended use (picnic, spectator, outdoor classroom)
  • Roof style intent and aesthetic notes (if required)

2) Footprint + layout intent

  • Approximate footprint (L x W) and clear height intent
  • Post layout intent (coordinate with circulation and table plan)
  • Clearance requirements for accessible routes and furnishings

3) Materials + finishes

  • Frame material and finish intent
  • Roof material and finish/colour intent
  • Corrosion resistance expectations (site-dependent)

4) Performance + compliance (high level)

  • General exposure notes (open field, coastal, etc.)
  • Any owner standards or performance expectations

(Engineering and final requirements should be confirmed for the specific project and location.)

5) Documentation requirements

To support coordination and approvals, request: – Spec sheet for the selected shelter model(s) – DWG files or layout drawings (as applicable) – Installation requirements and foundation coordination notes.

6) Scope clarity: whats included

Define who is responsible for:

  • Foundations and civil/site prep
  • Delivery and staging
  • Installation and inspections
  • Site restoration and cleanup

7) Options and alternates (if you want flexibility)

If you want a tender that allows value engineering without re-design:

  • Specify acceptable alternates (roof style, footprint range)
  • Identify must-have vs nice-to-have features

Common spec mistakes to avoid

  • Specifying a shelter without defining footprint, post layout intent, or documentation
  • Leaving foundations and installation scope unclear
  • Missing add-ons that affect layout (tables, benches, lighting)

How Westplay supports specifiers

Westplay supports landscape architects and municipalities with:

  • Shelter model recommendations aligned to use case and footprint
  • Spec-sheet and drawing intent support (including DWG where applicable)
  • Coordination guidance for access, foundations, and installation scope

Request spec support here


Share your opinion